New announcement. Learn more

97 The Terrace

Holmes Construction were engaged in the role of Main Contractor at this heritage building, located on the Terrace in the heart of Wellington.

During stage 1 of the works, our dedicated team constructed a new roofing structure with membrane, installed a lift for enhanced accessibility and carried out the comprehensive interior refurbishments on level 3 of the building, tailored to accommodate incoming tenants.

Stage 2 involved the fitout refurbishment to levels 1 and 2.

Stage 3, recently completed in March 2024, involved waterproofing the basement and establishing a new bar, as well as retaining space to the basement and the fitout works on the ground floor. We demonstrated an extremely high level of finish, collaborating with a number of trades to ensure both quality and value. We managed the intricacies of addressing underground water issues and laying new concrete floors, while also accommodating high-level services within a constrained site.

Allistar Cox Architects